MARINE & COASTAL CIVILS
Keep marine work moving through access, tides and live operations.
Plan the work around real access windows, marine logistics, temporary works, lifting, environmental requirements and operational assets.

Marine constraints can narrow the delivery window quickly.
The technical work is only part of the challenge. The wider exposure sits in changing access, tides, weather, live operations, temporary works, lifting interfaces and decisions that arrive after the workable window has started to close.
01
Access and programme exposure
Tidal windows, possessions, permits, weather and restricted access can affect productivity and reduce recovery options.
02
Interface and logistics exposure
Marine plant, lifting, temporary works, vessels, service access and live-asset interfaces require one coordinated sequence.
03
Commercial and handover exposure
Unknown asset conditions, incomplete scope and weak evidence can create disputed change, rising cost and difficult close-out.
What the Marine & Coastal Civils Package can cover.
The final scope depends on the asset condition, design status, access strategy, environmental requirements, programme and responsibility split.
- Port, dock and operational marine-asset maintenance.
- Jetty, pier, wharf and causeway repairs and improvements.
- Sea-wall, flood-defence and coastal-protection civils.
- Concrete, masonry and structural repair works.
- Drainage, outfalls, service routes and local reinstatement.
- Temporary access, compounds and working-area preparation.
- Attendance to marine logistics, lifting and specialist operations.
- Minor enabling, safety and access-control improvements.
Specialist interfaces: vessel operations, diving, crane or lifting services, specialist temporary works and marine design remain subject to the agreed project scope and the relevant competent appointments.

Create a realistic method and sequence before mobilisation.
01
Confirm the marine baseline
Review the asset condition, access, tidal or operating windows, surveys, environmental controls and information still outstanding.
02
Coordinate the interfaces
Agree temporary works, lifting, marine plant, workfronts, permits, logistics, live operations and specialist responsibilities.
03
Prove and hand over
Build inspections, photographs, surveys, test information, change evidence and close-out records progressively.
WHAT YOU RECEIVE
A marine package planned around the workable window.
You should be able to see when the work can happen, which specialist interfaces must align and what evidence supports the handover.
01
Access and logistics plan
Tides, weather, permits, vessels, workfronts and restricted operating windows brought into the sequence.
02
Specialist interface plan
Temporary works, lifting, diving, marine plant and live-asset responsibilities made visible.
03
Marine handover evidence
Inspections, repairs, surveys, photographs and close-out records built as the work progresses.
Keep the PM and QS informed.
Use a reporting rhythm that makes access, programme, change, marine interfaces and the next decisions easy to understand.
- Tidal, weather, access and working-window status.
- Temporary works, lifting, permits and specialist interfaces.
- Scope clarification and commercial change.
- Risk, opportunity and decision tracking.
- Quality evidence and handover status.


The outcome: visible control across a difficult operating environment.
A clear method, realistic sequence and progressive evidence help protect programme, manage cost exposure and keep marine-package decisions moving.
Use the three-step route to project certainty.
1
Send the tender information
Send the scope, asset information, access requirements, key dates and the main package pressure.
2
Receive your Grand Slam Offer Pack™
Review the scope, commercial basis, programme, assumptions, risks, opportunities and delivery controls.
3
Book your Free Project Certainty Review™
Close the critical decisions, assign ownership and confirm the controlled route into delivery.
Protect the workable window before access and interfaces close it.
Send the scope, access requirements, key dates and main concern. Haggar will review the information and confirm the next practical step.